1. Why PV DC SPD selection is different
Solar panels generate power whenever light hits them — no off switch. The DC circuit has no zero-crossing point, so a failing varistor can sustain an arc instead of clearing itself like in AC systems. That's why DC SPDs must follow IEC 61643-31, not generic AC standards.
Two practical facts drive the entire selection process:
- String voltage rises in cold weather — a 1000V system can hit 1100V+ on a frosty morning
- Long DC cables pick up more surge energy before reaching the inverter
So "my system is 1000V, I'll buy a 1000V SPD" is wrong. You size for the highest possible voltage, not the nominal one.
2. Step 1 — Calculate Ucpv correctly
The formula (simple version)
Cold-weather Voc = Voc(STC) × [1 + β × (Tmin − 25)] Ucpv ≥ Cold-weather Voc × 1.1 Plain English: Take your string voltage at standard test conditions, adjust it for the coldest temperature your site ever sees, then add 10% safety margin. That's your minimum Ucpv.
Worked example
- 20 modules × 41.5V = 830V at 25°C
- Temperature coefficient β = −0.28%/°C
- Site record low = −10°C
Voc(cold) = 830 × [1 + 0.0028 × 35] = 911V Ucpv ≥ 911 × 1.1 ≈ 1002V → Choose a DC SPD rated for 1200V Quick lookup table
| PV system voltage | Typical string Voc | Recommended Ucpv |
|---|---|---|
| 600V DC | ≤600V | 600V |
| 1000V DC | 800–1000V | 1200V |
| 1500V DC | 1200–1500V | 1500V |
Rule of thumb: If you don't want to calculate precisely, Ucpv ≥ 1.2 × Voc(STC) works for most quotes. But always use the temperature formula for final project specs.
3. Step 2 — Type 2 or Type 1+2?
- Type 2 = 8/20µs waveform, for indirect/induced surges
- Type 1+2 = 10/350µs + 8/20µs, can handle partial direct lightning current
Typical setup: Most rooftop PV → Type 2 at inverter DC input is enough. Large ground-mount sites → Type 1+2 at combiner box, then another Type 2 at inverter.
4. Step 3 — In, Imax, Up explained simply
| Parameter | What it means | Typical value for PV |
|---|---|---|
| In | Nominal discharge current — what it handles repeatedly | 10–20 kA |
| Imax | Maximum single surge it can survive | 20–40 kA |
| Up | Residual voltage left after clamping | Must be lower than inverter's withstand voltage |
Up is critical. Most string inverters have a withstand voltage (Uw) of 4–6 kV. Your SPD's Up should be ≤ 2.8–4.0 kV. But remember: every extra 0.5 meter of wire adds inductance and raises the actual voltage at the inverter. Short leads aren't optional — they're part of the specification.
5. Pole configuration — match your earthing

Important: Connect polarity correctly — DC+ to + terminal, DC− to − terminal. Reversed polarity will damage the SPD immediately.
6. Where to install — the 10-meter rule
| Distance from array to inverter | Recommendation |
|---|---|
| Cable run < 10 meters | SPD at inverter DC input is usually enough |
| Cable run > 10 meters | SPD at combiner box plus SPD at inverter |
Wiring best practices:
- Keep SPD leads ≤ 0.5 meters (shorter = better protection)
- Make L and PE wires the same length
- Don't coil excess wire — straight and tight
- Earth to enclosure ground bar, not painted metal
- Install backup protection (fuse or SCB) in series with the SPD
7. Backup protection — don't skip this
A DC SPD can fail short-circuit at end of life. Without proper backup, it becomes a permanent fault. Use one of these:
- gPV fuse — best choice for PV applications
- DC Miniature Circuit Breaker (MCB) — must be DC-rated
- Surge Circuit Breaker (SCB) — common in combiner boxes, combines SPD + backup
For ELECO ELS1-DC series, the maximum backup fuse is typically 125A gL/gG. Check the datasheet for exact coordination values. Do not use the string fuse as SPD backup.
ELECO DC SPD – T2 Series for PV
| Model | Ucpv | In | Imax | Poles | Type |
|---|---|---|---|---|---|
| ELS1-D20 DC | 500 / 600 / 800 / 1000V | 10 kA | 20 kA | 2P, 3P, 4P | Type 2 |
| ELS1-C40 DC | 500 / 600 / 800 / 1000V | 20 kA | 40 kA | 2P, 3P, 4P | Type 2 |
- IEC 61643-31 compliant
- Visual status window (green = OK, red = replace)
- Pluggable module on 35mm DIN rail
- Available in Shield type (compact) or OBO type (robust)
- Optional remote signaling contact
For 1500V DC projects or Type 1+2 requirements, contact our engineering team.
FAQ
Q: Can I use an AC SPD from my Distribution Board on the PV DC side?
No. AC SPDs lack DC arc-quenching capability and correct Ucpv ratings. Always use a DC SPD certified to IEC 61643-31.
Q: Is Type 2 enough for rooftop solar?
Yes, if the building has no external lightning protection system. If lightning rods are present, use Type 1+2 at the array entry point.
Q: Why does cold weather matter for Ucpv?
PV module voltage increases as temperature drops. A string that runs at 830V in summer can exceed 900V on a freezing morning. The SPD must stay non-conducting under that voltage.
Q: One SPD at inverter, or also in the combiner box?
If the DC cable from array to inverter is longer than 10 meters, install SPDs at both locations. Measure the distance along the cable path, not straight-line roof distance. The combiner box SPD catches the surge early; the inverter SPD protects the power electronics.
Q: Do I need an SCB?
Yes, especially in combiner boxes. The SCB disconnects the SPD if it fails short, without tripping on normal leakage current.
Conclusion
Selecting the right DC SPD for your solar PV system isn't complicated if you follow this order:
- Calculate Ucpv from cold-weather string voltage
- Choose Type 2 or Type 1+2 based on lightning exposure
- Pick In / Imax / Up that matches your site risk
- Install close to the busbar with leads ≤ 0.5 meters
- Add backup protection (gPV fuse or SCB)
ELECO ELS1-D20 and ELS1-C40 DC SPDs cover most 600–1000V PV installations in either Shield or OBO format.